Ausgrid Engadine Project Report
The project comprised multiple short 132kV conductor runs (2-3km) between the new Engadine substation and UGOH connections to existing overhead infrastructure, these critical links justifying

The project comprised multiple short 132kV conductor runs (2-3km) between the new Engadine substation and UGOH connections to existing overhead infrastructure, these critical links justifying

After several years of development with power and optical fibre partners, Jubatus has begun the rollout of new heavy duty integrated distributed temperature sensing (DTS) tubes, in high voltage power cables.

Jubatus is pleased to provide the following tips from our partner LIOS.

Jubatus was pleased to welcome friends and colleagues to the MCEC suites for a conversation about PD and DTS on Wednesday 9 September.